Gilbert Stream Realignment

Pipelines

Gilbert Stream Realignment

Project Features

  • DN750 pipeline realignment
  • Steep sided and deep creek & gully crossing
  • 13,000m3 cut and fill
  • 54m long 2m diameter curved culvert
  • All pipeline bends fabricated off site
  • Complex construction process with machine winching required on most slopes
  • Short pipeline tie in window – required lots of planning
  • Full conceptual and detailed design
  • Construction and commissioning engineering support

 